Building Your New Home Please use the following pictures as a guide only. |
|
Vacant block. Site is measured & set-out to determine the boundary of the property. Site is scraped or cut. Sewerage system is set up. Tap and water meter may appear at a later stage. (Above right) South East Water are responsible for the tap & meter location. |
| Boxing out & Pouring Slab |
Bricks & sand arrive on site. Framework may begin on home. |
| Windows may arrive on site and be installed. |
| Brickwork may begin on garage and then framework to garage roof. |
| Gutters & Fascia to roof. |
| Guard-rail to roof. Plumbing rough-in. Blue wall insulation paper. |
Our subcontractors are highly qualified and carry many years of experience. Roof tiles delivered, Brickwork on home to be complete before roof will begin. |
House is Locked-up: Temporary front door & sidelight. Electrical rough-in, Gas run-in, Brick clean, Site clean, Wall insulation (as per energy rating) Plaster to begin. |
| Fixing stage: Cupboard shelves, skirting, architraves, kitchen sinks, laundry troughs, bathroom basins, bath, doors & handles. Kitchen may begin. |
| Painting & Wall tiles to begin. |
Plumbing & Electrical Fit-Off, install Solar panels, down pipes, termite spray. Floor tiles, vinyl and carpet. |
During the last week... (T.A.P) Garage door, ducted heating system, driveway, fencing, appliances, flyscreens, security doors, letterbox, door stoppers, toilet roll holder, towel rails & clothesline. |
| Finished home for you to move in and enjoy! |
|
|
|
|
|
|